[proj_id=11]
Duration: February 1984–December 1984
Budget: 1 500 000 DRS (about €16 942)
Commissioned by: Ministry of Planning, Housing and Environment
Contractor: Department of Water Resources, Hydraulic and Maritime Engineering
Collaborators: Laboratory of Analytical Chemistry
Project director: Th. Xanthopoulos
The project components are the following: (1) Hydrological and hydraulic characteristics of the Kalamas River and the Lapsista ditch. (2) Water budget of the Pambotis Lake. (3) Sampling and water quality analyses. (4) Inventory of pollution sources. (5) Assessment of the potential of the development of the Ioannina area. (6) Inventory of water uses. (7) Formulation of pollution scenarios. (8) Fitting of a mathematical model for the pollution of the Kalamas River. (9) Conclusions regarding the water uses and the acceptable pollution loads.
Documents: