D. Koutsoyiannis, and N. Mamassis, Consultative report for the flood of December 2002 in the region of Limne Nesiou, Technical consulting for the floods of Lower Acheloos and Edesseos, Commissioner: Public Power Corporation, Contractors: D. Koutsoyiannis, N. Mamassis, 13 pages, Athens, February 2005.
[doc_id=731]
[Greek]
Full text
(731 KB)
Related project: Technical consulting for the floods of Lower Acheloos and Edesseos