Essential works to ensure the established ecological flow

D. Koutsoyiannis, N. Mamassis, and A. Efstratiadis, Essential works to ensure the established ecological flow, Specific Technical Study for the Ecological Flow from the Dam of Stratos, Commissioner: Public Power Corporation, Contractor: ECOS Consultants S.A., 22 pages, Athens, May 2009.

[doc_id=943]

[Greek]

PDF Full text (995 KB)

Related project: Specific Technical Study for the Ecological Flow from the Dam of Stratos