Investigation and remedy of the stability problems of the banks and bed of the Philothei Creek using mathematical models and modern environmental methods

[proj_id=121]

Duration: March 2004–September 2004

Budget: €74 500

Commissioned by: Municipality of Philothei

Contractor: Department of Water Resources, Hydraulic and Maritime Engineering

Project director: A. Stamou

The effect of a series of alternative environmental-friendly works in the Philothei Creek, aiming at the ensuring of bed and banks stability, is investigated. The project includes (1) identification of the geometrical characteristics of the creek, (2) assessment of a series of alternative environmental-friendly works at specific sites, (3) examination of these works from the hydraulic point of view (hydrological and hydraulic modelling) and (4) formulation of final scheme of works and estimation of their cost.