R. Ruoss, and D. Koutsoyiannis, Hydraulic analyses, Appendix C in Appendices to Engineering Studies I, Arachthos River, Steno - Kalaritikos hydroelectric project, Engineering Report, Commissioner: Public Power Corporation, Contractor: Arachthos Swiss-Anglo-German Consulting Group (ASAG), Report number 4, 140 pages, Athens, August 1984.
[doc_id=230]
[English]
Optimisation of tunnel dimameters. Head losses in the water conduits from Kalaritikos reservoir to tailrace output. Surge tank system. River diversion. Spillways. Bottom outlet.
Related works:
Related project: Arachthos River, Steno - Kalaritikos hydroelectric project, Engineering Report