D. Koutsoyiannis, N. Mamassis, and A. Efstratiadis, Essential works to ensure the established ecological flow, Specific Technical Study for the Ecological Flow from the Dam of Stratos, Commissioner: Public Power Corporation, Contractor: ECOS Consultants S.A., 22 pages, Athens, May 2009.
[doc_id=943]
[Greek]
Full text (995 KB)
Related project: Specific Technical Study for the Ecological Flow from the Dam of Stratos