Arachthos River, Aghios Nicolaos hydroelectric project, Engineering Report

[proj_id=39]

Duration: November 1983–August 1994

Commissioned by: Public Power Corporation

Contractor: Arachthos Swiss-Anglo-German Consulting Group (ASAG)

Documents: