D. Koutsoyiannis, and P. van der Riet, Hydrology, Ch. 5, Arachthos River, Aghios Nicolaos hydroelectric project, Engineering Report, Commissioner: Public Power Corporation, Contractor: Arachthos Swiss-Anglo-German Consulting Group (ASAG), Report number 2, 38 pages, Athens, August 1984.
[doc_id=228]
English
More information