Hydrological and hydraulic study for the flood protection of the new railway in the region of Sperhios river

[proj_id=128]

Duration: October 2002–January 2003

Budget: €90 000

Commissioned by: ERGA OSE

Contractor: D. Soteropoulos

Collaborators: D. Koutsoyiannis

Documents: