Engineering report of the Korinthos sewer system, Study of the Xerias creek, Introductory part

[proj_id=27]

Duration: January 1998–December 1998

Budget: 105 000 000 DRS (about €316 743)

Commissioned by: Ministry of Environment, Planning and Public Works

Contractor: Ydroexigiantiki

Documents: